Now, that the in- and outside of the house are done in bare bones, it is prepared for new pipes, plumbing and a new electric circuit. This means Katrin and I had to make up our minds as to where the bathrooms (there’s one on each floor) and the kitchen sink(s) will be located. There will be one large kitchen on the lower floor and one bar type thing with a sink on the upper floor. It is practical that the construction gods foresaw ripping up the walls at a stage where those walls are still dirty and full of dust. And this is exactly what happened when Pere and his co-worker came to flex some water canals:
What we see here is the view from the canals of the kitchen sink, the new canals for the waste water, before the camera turns to the new bathroom and finally, the sleeping room.